ADR-068: Resource and operator upgrades roll through the environments in verified steps

Status: Accepted (2026-10-28) Builds on: ADR-017: The GitOps repo owns every Kubernetes manifest; services ship an image (the gitops repo owns every manifest), ADR-058: Images and operators are pinned exactly per release; the platform installs the operators a cluster needs as Argo CD applications (pinned versions, operators under operators/), ADR-061: Databases are backed up by the CloudNativePG Barman Cloud plugin to a bucket resource; a point-in-time restore is a new generation next to the running one (backups and restore by generation), ADR-063: Autonomy is declared in system.yaml; an engine is bound by a contract and only signals can act before a merge (an engine never promotes forward), spec 121; the release side is the companion ADR ADR-069: One versions table pins everything, and every release proves the upgrade from the previous one

Until spec 121 a change of a resource’s version changed the image in dev, staging and prod in one render, and a new platform release moved every environment’s pins at once. Nothing checked a backup first, nothing waited for the upgraded resource, and nothing stopped prod when dev broke. CloudNativePG 1.30 upgrades a database major in place (pg_upgrade --link, offline) when imageName changes, requires source and target images on the same OS distribution, and asks for a new Barman server name with each major because pg_upgrade creates a new system identifier.

  1. One step is one environment and one pull request. resources.<r>.instances.<env>.version holds a per-environment major (database, cache, broker); /resource:upgrade <r> --to <major> [--env <env>] writes exactly one environment’s step, and the last environment’s step folds the entries back into resources.<r>.version. A CI check in the gitops repo refuses a pull request that changes one resource’s major in two environments.
  2. Dev first, staging after dev is verified, prod by hand. A step is refused unless the nearest earlier environment runs the target and is verified. Staging follows by itself only with promote: after-dev-smoke. Prod always needs a person’s --env prod. An autonomy engine never runs these steps.
  3. A step counts only when verified: the resource is healthy at the new image within 15 minutes, its connection Secret keeps its name, and the smoke tests of every component instance that uses it in that environment pass. The result is recorded in the cluster (ConfigMap <system>-<resource>-upgrade in the environment’s namespace), which is what the next step reads. A failed verification stops the rollout with exit code 1 and names the way back.
  4. A database major step needs a backup from the last 60 minutes in that environment (dev included), read from the same backup.last_success that cplat system status --json shows. Cache and broker steps check no backup and say so.
  5. Database majors upgrade in place; each major archives to its own Barman server (<cluster>-pg<major>), recorded as archives in restore-state.yaml, and a restore to a time before the upgrade recovers into a generation on the old major. Every Postgres image comes from one image family on one Debian release, so pg_upgrade always runs within one distribution.
  6. Minor and patch pins roll the same way. A platform release moves dev’s engine pins; staging and prod keep the image of their rendered files (a held pin, like an overlay’s newTag) until a step moves them; no backup is checked. A held environment takes this release’s pin before its next major step.
  7. Operators move once per cluster, with the earliest environment there. Every environment of a gitops repo deploys to its one cluster, so an operator pin moves with dev’s step and the verification runs the smoke tests of every environment on that cluster.
  • No environment changes its major without its own reviewed pull request, and prod never moves before staging is verified.
  • A failed upgrade leaves the later environments untouched and readable; the way back for a database is /resource:restore, by a person.
  • Verification needs access to the cluster and the components’ smoke tests; a component without a smoke recipe blocks the rollout until it has one.
  • system.yaml shows mid-rollout state (instances.<env>.version); the folding step removes it.
  • Automatic rollback or downgrade; zero-downtime major upgrades; upgrading external resources, Kubernetes or nodes.
  • Per-environment clusters: the order of AC-121.20 is stated for the spec that adds them.